BRI-Hub
Installation
For proper operation the device must be placed in a suitable location. It should be a clean and dry environment without direct sun light. Sufficient cooling must be possible. Do not pack or cover the unit or set other warm equipment on top of it.
Tabletop
Just place the unit on a clean and dry place. Multiple
Wall mount
The wall assembly works as follows:
•Drill two holes vertically, one above the other with a separation of 95 mm, into the wall where you want to place the
•Completely put the dowels into the drilled holes.
•Turn the
•Now place the
•Carefully shift the
Caution! Don't use any excessive force. If the screws are turned too far into the dowels, the screws may not move into the slots. Turn the screws out a little and try again.
Rack Mount
For the assembly into a rack an optional 19” front panel is needed. This may hold one or two
•To do this the panel is set onto the front of the
•The two screws are put into the holes of the panel provided for this. (Left from the NT port and right besides the power LED.