Installation
Example of Daisy-Chain Configuration
cable 1 |
|
|
| Primary unit (BANK 00) | ||||
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary unit (BANK 01)
cable 2
Secondary unit (BANK 02)
cable 3
Secondary unit (BANK 03)
Getting Started:
Step 1: Make sure that all servers, LCD Rack Console, and PRO3 KVM Switches are powered off and that each PRO3 KVM Switch has been assigned a unique BANK address.
Step 2: Place all primary and secondary KVM switches in the desired location.
16