SPP-R200
13) Click “Finish”.
14)The shortcut changes to show a green indicator asshown below. The connection is complete when the BT LED of the
Rev. 1.07 | - 38 - |
13) Click “Finish”.
14)The shortcut changes to show a green indicator asshown below. The connection is complete when the BT LED of the
Rev. 1.07 | - 38 - |