Cabletron Systems SWPIM-BRI manual My commission expires

Page 34

Appendix B: FCC Part 68 - User’s Information

I attest that the operator(s) maintainer(s) of the digital CPE responsible for the establishment, maintenance and adjustment of the encoded analog content and billing information has (have) been trained to perform these functions by successfully completing one of the following: Check appropriate one(s).

a.A training course provided by the manufacturer/grantee of the equipment used to encode analog signals; or

b.A training course provided by the customer or authorized representative, using training materials and instructions provided by the manufacturer/grantee of the equipment used to encode analog signals; or

c.An independent training course (e.g. trade school or technical institution) recognized by the manufacturer/grantee of the equipment used to encode analog signals; or

d.In lieu of the proceeding training requirements, the operator(s) maintainer(s) is (are) under the control of a supervisor trained in

accordance with

 

above.

I agree to provide

with proper documentation

 

(Telco’s Name)

 

 

to demonstrate compliance with the information as provided in the proceeding paragraph, if so requested.

(Signature)

(Title)

(Date)

Subscribed and sworn to me this

 

day of

 

, 19

.

 

 

 

 

 

 

 

(Notary Public)

My commission expires:

B-4

SWPIM-BRI Installation Guide

Image 34
Contents SWPIM-BRI Page SWPIM-BRI Installation Guide FCC NoticeAustralian Telecom Industry Canada NoticeVcci Notice Cabletron SYSTEMS, INC Program License Agreement IiiSWPIM-BRI Installation Guide SWPIM-BRI Installation Guide SWPIM-BRI Installation Guide SWPIM-BRI Installation Guide Vii Cabletron Systems Limited Program License AgreementViii SWPIM-BRI Installation Guide Declaration of Conformity PO Box Rochester, NHSWPIM-BRI Installation Guide Contents Contents Xii SWPIM-BRI Installation Guide Using this Guide IntroductionSWPIM-BRI Features Structure of this GuideRelated Manuals Document Conventions Following conventions may be used in this documentGetting Help Your email addressIntroduction Xviii SWPIM-BRI Installation Guide Chapter Installation Unpacking the SWPIM-BRIInstalling the SWPIM-BRI Installing the SWPIM-BRI Lanview LED Indications Refer to -1 for the link LED indications for the SWPIM-BRIConnecting to the Network Completing the InstallationSWPIM-BRI Installation Guide Appendix a Specifications Physical PropertiesPinout for the S/T-Interface Connector Network InterfacePinout for the U-Interface Connector Environmental RequirementsRegulatory Compliance Appendix B FCC Part 68 USER’S Information REN/SOC FIC UsocAppendix B FCC Part 68 User’s Information Being duly sworn, state My commission expires