CHAPTER 2
INSTALLATION
This chapter contains instructions for unpacking and installing the 7C03 MMAC SmartSwitch in an MMAC chassis. The 7C03 MMAC SmartSwitch can be installed in an
Note: Because of the modular nature of the power supplies and interface modules in the
2.1 UNPACKING THE 7C03 MMAC SMARTSWITCH
Unpack the 7C03 MMAC SmartSwitch by using the following steps:
1.Remove the 7C03 MMAC SmartSwitch from the shipping box. (Save the box and packing materials in the event the 7C03 MMAC SmartSwitch must be reshipped.)
2.Remove the 7C03 MMAC SmartSwitch from the plastic bag.
3.Examine the 7C03 MMAC SmartSwitch and check for damage. If damage exists, DO NOT install the 7C03 MMAC SmartSwitch; contact Cabletron Systems Technical Support. Otherwise, install the 7C03 (see Section 2.2).