Extron electronic RGB 400XI manual Dimensions and Templates, Cut-out Templates

Page 10

Dimensions and Templates

Cut-out Templates

All the templates in this section are actual size. Also, they all include the recommended 0.1” (0.25 cm) clearance on all sides of the electrical wall box to allow room for the raised areas surrounding the knockouts.

The dashed line in each template indicates the cut-out area for installing a wall box. If you plan to install the interface without a wall box, use the smaller cut-out area indicated by the dotted lines.

Use the following templates as a guide for cutting a hole in a wall or furniture for the 2-, 3-, and 4-gang size electrical boxes in order to install the appropriate interface.

The light gray area represents the layout of the electrical box (3.75"H x 3.75"W) against the rear of the RGB 460xi, or RGB 472xi front panel.

RGB 460xi, or RGB 472xi 2-gang Cut-out Template

To install the interface without a wall box, use the cut-out area (3.00"H) indicated by the dotted line.

The dashed line indicates the cut-out area (3.95"H x 3.95"W) for installing the electrical wall box.

 

 

 

 

 

 

 

RGB 460xi, RGB 472xi Cut-out Template

A-2 RGB 400xi Series Installation Guide

The light gray area represents the layout of the electrical box (3.75"H x 5.60"W) against the rear of the RGB 464xi, RGB 474xi, RGB 468 Mxi, or RGB 478 Mxi front panel.

RGB 464xi, RGB 474xi, 468 Mxi, or 478 Mxi 3-gangCut-out Template To install the interface without a wall box, use the cut-out area (2.80"H x 5.50" W) indicated by the dotted line. The dashed line indicates the cut-out area (3.95"H x 5.80"W) for installing the electrical wall box.

 

 

 

 

 

RGB 464xi, RGB 474xi, RGB 468 Mxi, RGB 478 Mxi

Cut-out Template

RGB 400xi Series Installation Guide

A-3

Image 10
Contents Wall Box-Mountable Interfaces with Euro Channel versions USAPrecautions Extron’s WarrantyTable of Contents Table of Contents, cont’d About this Guide Installation OverviewIntroduction Installation ProceduresPreparing the site and installing the wall box UL RequirementsInstallation, cont’d Mounting the interface to the wall boxEuro Channel installation Pre-installation testing/troubleshootingInstallation Specifications Mounting the optional AAP deviceAccessories RGB 400xi SeriesDimensions and Templates Cut-out TemplatesRGB 400xi Series Installation Guide