DISTRIBUTION PANEL
Installation
For safe operation, the patch panel first needs to be grounded. Follow these steps:
1.Strip one end of the 6 AWG copper ground wire to approximately 0.75” (1.9 cm).
2.Crimp the ground wire to the ground lug; use a crimping tool of the appropriate size.
3.Attach the ground lug to the patch panel using the two included
4.Connect the other end of the ground wire to a suitable grounding point at your site.
Then install the panel:
CAUTION
Do not plug the cables into the top and bottom rows of connectors on the panel’s middle and right side at the same time. Sliding the mechanical door up or down prevents this from happening and guards the attached equipment from damage. You can use the panel’s eight left- side connectors (both top and bottom rows) at the same time.
1.Place the panel at a level position on a rack or cabinet.
2.Using the supplied
3.Install the
4.Connect a telco cable to the
5.Route the cables, making sure that they are not tangled. (This will eliminate crosstalk and attenuation.)
5