Q-Logic 5800V SERIES Installation Instructions Verify the Package Contents, Mount the Switch

Page 3

Quick Start Guide

Installation Instructions

Congratulations on your purchase of the SANbox® 5800V Series Stackable Fibre Channel Switch. This guide describes the steps to install and activate your new switch using a Windows® workstation. For advanced options and instructions (including Solaris®, Linux®, and Mac OS X® installations), refer to the SANbox 5800V Series Stackable Fibre Channel Switch Installation Guide, which is available at www.qlogic.com.

NOTE: Do not apply power to the switch until instructed in Step 5.

Step 1. Verify the Package Contents

The SANbox 5800V Series Fibre Channel Switch is shipped with the following items:

1SANbox 5800V Series Stackable Fibre Channel Switch

1AC Power cord (5800V)

2AC Power cords (5802V)

4 Rubber feet

1 Enterprise Fabric Suite 2007 CD (free 30-day trial)

Depending on which SANbox 5800V switch you ordered, it may also include Small Form-factor Pluggable (SFP) transceivers and/or XPAK switch stacking cables. XPAK switch stacking cables connect SANbox 5800V Series switches together through the XPAK ports.

NOTE: If you ordered SFPs and XPAK switch stacking cables separately, they will arrive in a different package. XPAK switch stacking cables connect SANbox 5800V Series switches together through the XPAK ports.

Step 2. Mount the Switch

For a surface mount, attach the rubber feet to the locations on the bottom of the switch. For a rack mount, install the SANbox 3000/5000 series rail kit and the switch in a standard 19" rack as described in the SANbox 3000/5000 Series Fibre Channel Switch Rack Mounting Guide.

3

Image 3
Contents Quick Start Guide Webhttp//support.qlogic.com Mount the Switch Installation Instructions Verify the Package ContentsStack Switches Install Transceivers Connect the Workstation to the SwitchVerify Workstation Requirements Log In to the Switch Run the Configuration WizardConnect Devices Page 50861-02 B