METRObility Optical Systems 3508-11 manual Apply Power

Page 9

5 Apply Power

The CenturySwitch is equipped with an internal 100-240V, 50-60Hz, 25W power supply. When making power connections, connect the power cord to the input jack located on the back of the switch before making the AC connection to the outlet.

AC Line: 100-240V 50-60Hz

MADE IN TAIWAN

AC Power Socket

IMPORTANT: If the CenturySwitch loses power, wait at least 10 seconds before applying power again.

The CenturySwitch is shipped with a standard North American 3-pin power cord which is UL (USA), CSA or CUL (Canada) listed or ap- proved. For installation in regions outside of North America, replace the power cord with a cord approved by the appropriate safety agencies. Any cord used must have a CEE-22 standard V female connector on one end and meet IEC 320-030 specifications. European power cords must be harmonized and designated with a HAR marking on the cord jacket to comply with the CENELEC Harmonized Document HD-21.

The CenturySwitch does not have a power switch. After connecting the unit to the AC receptacle, check that the PWR (power) LED is illumi- nated. A steady green light indicates the unit is receiving power.

Once power is applied to the unit, use the individual Link/Act LEDs on the front panel to verify correct segment connectivity.

Lancast 8-Port CenturySwitch 9

Image 9 Contents
Lancast Port CenturySwitch Fiber Optic Modules Lancast CenturySwitchProduct Overview Installation Guide Product Overview Key Features Choose a Location Fixed Ports Connect to the NetworkSet the Duplex Mode Switch Install the ModuleSet the Backpressure Jumper Connect to the Network Apply Power Installation Guide Per Port LEDs LED OperationTroubleshooting Cabling ProblemsWorkstation Problems Link/Act LED is OFF at a port Other ProblemsTopology Solutions Data Rate Technical SpecificationsPhysical CSA TUV Product Safety, EMC and Compliance StatementsWarranty and Servicing Lancast 8-Port CenturySwitch