Table of Contents / Setup Checklist
Table of Contents
Safety Warnings | . | . . |
| 2 | System Setup . . . . . . . . . . . | |
Important Safety Instructions | . . | . . | Troubleshooting / Specifications. . | . . . . 13 | ||
Table of Contents / Setup Checklist . . | . | . | . | 6 | Document Revision History / Notes . | . . . 14 |
PCS100R Product Description . . . . | . | . | . | 7 | Open Source Software Notice. . . | . . . . 15 |
Rear and Front Panel Overviews . . . | . | . | . | 8 | Warranty | Back Cover |
Rack Installation | . | . |
|
| ||
|
|
|
|
|
|
|
Setup Checklist
1.Unpack the PCS100R Pro:Centric™ server unit and all accessories. Accessories provided: Power Cord and Adapter
2.Select the location for mounting the PCS100R. Ensure that there is adequate ventilation available.
3.Obtain the necessary attachment hardware to mount the PCS100R chassis in its targeted location.
4.Plan and install the necessary cabling and network (Ethernet) and AC power access for the PCS100R. You will also need the following to connect a PC directly to the PCS100R for system setup verification purposes:
•DB9
•(Optional) USB
5.Carefully follow the rack installation procedure for the PCS100R (see pages 9 and 10).
6.If not already done, install the modulator and upconverter that will receive the ASI output signal from the PCS100R. Refer to the manufacturer’s documentation.
7.Complete the setup procedure for the PCS100R (see pages 11 and 12).
6 |