AT-8000/8POE Layer 2 Fast Ethernet Switch Installation Guide
2A | 50- |
| |
| 60Hz |
100- | |
| 240 V |
| AC |
830
Figure 14. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
Warning: Power cord is used as a disconnection device. To de- energize equipment, disconnect the power cord. E3
Pluggable Equipment. The socket outlet shall be installed near the equipment and shall be easily accessible. E5
3.Verify that the POWER LED is green. If the LED is OFF, refer to Chapter 3, “Troubleshooting” on page 51.
The switch is now powered on and ready for network operations. To start a local management session on the switch, refer to “Starting a Management Session” on page 46. To start a remote management session, the switch must have an IP address. For information about giving the switch an IP address and starting a remote management session, refer to the AT-S81 Management Software User’s Guide.
45