Quick Install Guide | 5 |
5.Place the switch in its operating location
If installing the switch in a rack:
•Remove the rubber feet
•Attach the
Use the screws provided with the switch to mount it in a rack. Other screws may damage the switch.
• Mount the switch in the rack
6.Apply AC power to the switch
Plug the power cord into the AC power connector on the switch’s rear panel, as shown in Figure 1. The FAULT LED may light for one or two seconds as the switch runs internal tests. If the LED remains lit, refer to the
Figure 1: AT-8848 front panel and rear panel with AC power inlet.
| GBIC |
L /A |
|
LINK |
|
ACT |
|
GBIC | 49 |
ENABLED | |
FAULT |
|
L /A | GBIC |
49 |
|
50 |
|
| 50 |
PORT ACTIVITY | L/A | LINK 100M | ACT | LINK 10M | ACT | D/C | FULL DUP | HALF DUP | COL |
L/A | 1 | D/C | 3 | 5 | 7 | 9 | 11 | 13 | 15 | L/A | 17 | D/C | 19 | 21 | 23 | 25 | 27 | 29 | 31 | L /A | 33 | D/C | 35 | 37 | 39 | 41 | 43 | 45 | 47 |
| 2 |
| 4 | 6 | 8 | 10 | 12 | 14 | 16 |
| 18 |
| 20 | 22 | 24 | 26 | 28 | 30 | 32 |
| 34 |
| 36 | 38 | 40 | 42 | 44 | 46 | 48 |
Intelligent Workgroup Switch
ASYN0
RESET
RPS FAULT PWR
7.Fit the power cord retaining clip.
A retaining clip is supplied with the switch for the AC power inlet on the switch’s rear panel. Fit this clip to secure the power cord in place.
8.Check that the Power LED on the switch’s front panel lights green
If the PWR LED fails to light, refer to the
9.Connect the Redundant Power Supply (Optional)
The Switch is designed to operate with the
10.Install GBICs (Optional)
Slide the GBICs into the GBIC slots. Press each GBIC firmly into place.
A range of GBICs have been tested and approved for use with