RuggedCom RSG2200 manual Pluggable optics Installation, removal, and precautions

Page 24

4.8 Pluggable optics – Installation, removal, and precautions

The RSG2000 series of products can be ordered with pluggable optic form factors such as SFP (Small Form-factor Pluggable) or GBIC (Gigabit Interface Converter) modules. These modules can be safely inserted and removed while the chassis is powered and operating – this feature is also known as “hot-swappable”. When inserting or removing optics there are several precautions that should be taken. They include:

Ensuring that dust caps are mounted on SFP cages at all times unless a user is in the process of inserting or removing an SFP module. The dust caps will prevent the accumulation of residue or particles that may inhibit proper operation.

Ensuring that the user has properly discharged any possible electrostatic build-up and electrostatic discharges (ESD). This can be accomplished by properly user ‘grounding’ via an ESD wrist strap, or by touching earth or chassis ground before performing installation or removal of optics. ESD can damage or shorten the life of optical modules when not plugged into a chassis.

SFP and GBIC optical modules should always be stored in an ESD safe bag or other suitable ESD safe environment, free from moisture and stored at proper storage temperature (–40 to +85°C).

Disconnect all cables from SFP or GBIC module before insertion or removal of module.

Only RuggedCom Inc. certified optics should be used on RuggedCom products. Damage can occur to optics and product if compatibility and reliability have not been properly assessed.

4.8.1 Module Insertion – GBICs and SFPs

To insert GBICs or SFPs, special attention should be taken into the proper module orientation. Refer to Figure 22 for proper module orientation, as ports on the upper row of the product require optics to be inserted topside-up, and ports on the lower row of the product require modules to be inserted topside-down. GBICs should be inserted with module dust cover in place. SFPs should be inserted with dust cover in place, and the bail-latch in the locked position. Module should gently slide into port and should lock in place when module is fully inserted. To protect optics, dust covers should always be installed when cables are not connected.

Figure 22: SFP Orientation for top row and bottom row ports

24

2008 RuggedCom Inc. All rights reserved

Rev105

Image 24
Contents RuggedSwitch RSG2200 Port Modular Managed Gigabit Ethernet SwitchTrademarks Table of Contents Table of Figures Table of TablesProduct Overview Functional OverviewFeature Highlights Ethernet Ports 2008 RuggedCom Inc. All rights reserved Rev105 Mounting Flexibility Ethernet, LED Status, and Power Panels Ethernet Panel Description1000LX SC connector 1000LX LC connector1000LX ST connector Display Panel DescriptionDetermine alarm code LEDInstallation Rack MountingRSG2200 PANEL/DIN Rail mounting diagram with Panel and DIN Rail MountingPower Supply Wiring and Grounding RSG2000 Series Philips Screw Terminal BlockTesting Power source is ACChassis Ground is connected to the Safety Ground Description UsageAC Power Supply Wiring Examples DC Power Supply Wiring Examples Dual Power Supplies DC and AC Inputs Dielectric Strength Hipot Testing Dielectric Strength Hipot Testing Failsafe Alarm Relay Wiring and Specifications Failsafe Alarm Relay WiringConsole Port Wiring Signal GNDGigabit Ethernet 1000Base-TX Cabling Recommendations Pluggable optics Installation, removal, and precautions SFP Orientation for top row and bottom row portsGbic Module Removal Technical Specifications Power Supply SpecificationsFailsafe Relay Specifications Networking Standards SupportedTwisted-Pair Port Specifications Fiber Optical Specifications  2008 RuggedCom Inc. All rights reserved Rev105 Type Test Specifications Electrical Safety Levels Comments95% IEC Operating Environment Parameter Range CommentsMechanical Specifications Parameter Value Comments18.29 x 12.14 x 1.75 inches Warranty Agency ApprovalsAgency Standards Comments FCC Part 15, Class a Approved
Related manuals
Manual 10 pages 59.79 Kb