Parker Hannifin SEI-2, SEH-175, R-404A, R-134A, R-507 manual Installation, Battery Holder and Relays

Page 1

Chiller Controller

Installation and Servicing Instructions

The Chiller Controller has the most features of any Sporlan controller. It will control one or two Sporlan Electric Expansion Valves, and con- trols superheat by means of pressure-temperature control. The controller controls each valve independently, and the valves may be different sizes, i.e. one SEI-2 and one SEH-175. Pressure-temperature superheat control for one of four common refrigerants may be selected. Controllers can be ordered configured for R-22, R-134a, R-404A, R-407C and R-507. The refrigerant type can be changed in the field by use of the optional “Panel Display.” Onboard readouts show actual superheat, superheat set point, and valve position. Two push buttons are provided on the board, to change the superheat set point, as well as open, close, or position the valve. Proportional and Integral set points are also included to change responsiveness of the valve.

As illustrated in Figure 1, the controller is provided with hardware and input/output connections for a number of user specified purposes. See below:

One or two valve control

Two pressure inputs (transducer supplied by Sporlan)

Two digital inputs (from external switches or relays)

Four temperature inputs (Sporlan supplied surface or air sensors)

Optional battery backup for onboard time clock and fail-safe

valve closure

Two digit LED readout

One green LED indicator

One red LED indicator

Two push buttons for set point, alarm cancellation, etc.

One 8-position dip switch for addressing, mode selection, etc.

Two 20 amp, 240 VAC NC/NO relays

One 5 amp 240 VAC NC/NO relay

RS 485 port

24 Volt AC

50/60 Hz.

40 VA Input

Panel

Display

Jack

Figure 1

Terminals for Valve 1 shown. Terminals for Valve 2 similar.

RS 485 Post

Red

 

 

 

 

 

 

 

 

 

 

 

 

Status

 

 

 

LED

 

 

 

PB1

PB2

 

 

 

 

Two Push

Buttons

Holders for Optional Fail Safe Batteries

Two 20 ampere

240VAC NC/NO relays

One 5 ampere

240VAC NC/NO relay

DI Pumpdown Terminals

1-

 

Pressure

 

1S

 

Transducer

1+

 

Terminals

 

RValve 1

G Cable

W Terminals

B

TS2 Temperature

Sensor

TS1 Terminals

Two Digit

LED Display

Green

Status LED

Panel Display jack

Please note that although relays, etc. appear on the Chiller Board, standard software does not support those devices. Custom (proprie- tary) software must be written for anything other than superheat con- trol. Please contact Sporlan Division of Parker for more information.

INSTALLATION

When handling the boards, electrostatic protection procedures should be followed. The installer should be grounded through a ground strap. If ground straps or other ESD protection is not available, ONLY handle the board by its edges or by the battery holders. DO NOT TOUCH ANY COMPONENTS ON THE BOARD EXCEPT

THE BATTERY HOLDER AND RELAYS.

1.The board should be mounted in a dry, protected environment using the predrilled mounting holes in each corner. Make sure none of the printed circuit paths or components are touching the metal panel or any thing else conductive.

2.If only one valve is used, connections are to be made to terminal block closest to display readout and push buttons PB1 and PB2.

3.Controllers are configured for pressure temperature superheat control.

4.Connect temperature sensor to TS2. The sensor is not polarized. For suction lines 7/8” or less, the sensor should be mounted to the cop- per suction line after the evaporator, using the furnished clamps. For larger lines or steel piping, a “well sensor,” available from Sporlan, should be installed.

5.The pressure transducer should be mounted on the top of the suction line near the temperature sensor location. Transducer connections to the board are as follows:

The power wire is red and is connected to the 1+ terminal.

The signal wire is green and is connected to the 1S terminal.

The ground wire is black and is connected the 1- terminal.

6.The valve leads are connected to the terminals labeled Valve 1.

The black lead is connected to terminal labeled B of Valve 1.

The white lead is connected to terminal labeled W of Valve 1.

The green lead is connected to terminal labeled G of Valve 1.

The red lead is connected to terminal labeled R of Valve 1.

7.DI1 is a digital input used as a pumpdown terminal. A short or closed contact from an external relay will close the valve for pump- down. When the relay opens or the short is removed, the valve will return to normal operation.

8.If two valves are used the second valve and its temperature sensor, pressure transducer, and pumpdown are connected as above. Caution should be used on two valve systems to make sure that the sensors are connected to the terminal strip used for the valve they are controlling.

The temperature sensor for Valve 2 is connected to TS4 as described above.

The pressure transducer for Valve 2 is connected to 2+, 2S, 2- as described above.

The valve is connected to terminals labeled Valve 2 as described above.

The pumpdown terminal for Valve 2 is labeled DI2. It is con- nected as described above.

Power is connected to the terminal marked 24VAC. Power requirements are 24 volts AC at 40 VA. For protection from electrical transients, connect one MOV varistor between one leg of the input voltage of the 24 VAC transformer and earth ground. Connect a second MOV varistor between the other leg of the input voltage of the 24 VAC transformer to earth ground. A recommended part number for a MOV is Harris Semiconductor

Image 1
Contents Battery Holder and Relays InstallationOperation POS1 ModeRemote Panel Display Controller MenusMOP1 Mode SSP1 ModeCTS1 Mode PRO1, INT1, DER1, DON1, DOF1 and DST1 Setting ProcedureChiller P/T Controller Wiring Schematic