EQUIPMENT CHECKLIST
Equipment Checklist
After unpacking the TigerSwitch 10/100/1000 unit, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.
Package Contents
•TigerSwitch 10/100/1000 unit, SMC8024L2
•Four adhesive foot pads
•Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch
•Power
•
•This Installation Guide
•Installation and Management Guide CD
•SMC Warranty Registration
SMC
Optional Rack-Mounting Equipment
If you plan to
•Four mounting screws for each device you plan to install in a
•A screwdriver (Phillips or flathead, depending on the type of screws used)