SMC Networks 10/100 manual Installing the Switch, Equipment Checklist, Selecting a Site

Page 14

INSTALLING THE SWITCH

INSTALLING THE SWITCH

The EZ Switch 10/100 can be placed on a desktop or shelf and stacked with other devices using the provided 4 rubber foot pads

Equipment Checklist

After unpacking the EZ Switch 10/100, check the contents of the box to be sure you’ve received the following components:

EZ Switch 10/100 SMC-EZ6505TX or SMC-EZ6508TX

Appropriate DC power adapter

Four rubber foot pads

SMC Warranty Registration Card

This User Guide

Selecting a Site

Be sure to follow the site selection guidelines below when choosing a location:

Select a suitable location for the switch:

It should be accessible for installing, cabling and maintaining the switch.

The temperature and humidity should be within the ranges listed in the specifications.

The status LEDs should be clearly visible.

4

Image 14
Contents Page Page EZ Switch 10/100 User Guide Copyright Limited Warranty Limited Warranty Compliances FCC Class BVii Table of Contents Page Description of Hardware Features and BenefitsIntroduction Port and Switch Status LEDs Front Panel LEDsRear Panel Selecting a Site Installing the SwitchEquipment Checklist Instructions Sample Applications Cascading Switches Troubleshooting Possible SolutionsRJ-45 Connector Pin Assignments Cable SpecificationsCable Type and Connector RJ-45 Pin Assign Ments Straight-Through Cable End Specifications EZ Switch 10/100SMC-EZ6505TX SMC-EZ6508TX Specifications SMC-EZ6505TX, SMC-EZ6508TX
Related manuals
Manual 318 pages 11.57 Kb