Wyse Technology X90e manual Installing the Upgrade Kit, Removing bottom screws from access cover

Page 10

4

Installing the Upgrade Kit

To install the 1-GB or 2-GB flash and 1-GB RAM Upgrade Kit in an X90 or X90e mobile thin client:

Caution

Follow all precautions listed in the Quick-Start Guide that came with your mobile thin client for disconnecting and reconnecting the mobile thin client.

1.Perform a proper shutdown of the mobile thin client by closing all files and ending your session, and then press the power button to turn off the mobile thin client.

2.Unplug the power cord and power adapter, and remove any other cables from the mobile thin client prior to disassembly.

3.Position the mobile thin client face down, and then using a small Phillips screwdriver remove eight (8) screws from the bottom of the unit as indicated in Figure 5.

Figure 5 Removing bottom screws from access cover

4.Using a flat edge tool, preferably plastic, insert its tip in the depressed area as shown in Figure 6 and carefully lift up the cover to remove.

Figure 6 Lifting off the access cover

Image 10
Contents Installation Guide Copyright Notice Iii This page intentionally blank Contents ViContents This page intentionally blank About this Guide Wyse Technical SupportKit Warranty Getting StartedRequired Tools and Materials Installing the Upgrade Kit Removing bottom screws from access coverRemoving an older-type flash module Removing the RAM module Verifying the Mobile Thin Client’s Operation Closing the WinPing windowShutting down from the XPE Test window Client Information Attaching the Upgrade Serial Label Attaching the Upgrade Serial LabelFigures