Omega LVUD-101, LVU-700 manual Unpacking Instructions

Page 3

UNPACKING INSTRUCTIONS

UNPACKING INSTRUCTIONS

Remove the Packing List and verify that you have received all equipment, includ- ing the following (quantities in parentheses):

Ultrasonic Level Measurement System (1)

Operator’s Manual (1)

If you have any questions about the shipment, please call the Omega Customer Service Department. When you receive the shipment, inspect the container and equipment for signs of damage. Note any evidence of rough handling in transit. Immediately report any damage to the shipping agent.

Note:

The carrier will not honor damage claims unless all shipping material is saved for inspection. After examining and removing contents, save packing material and carton in the event reship- ping is necessary.

2For Ultrasonic Point Level Switches

Image 3
Contents LVU-700 LVUD-101 Servicing North America Unpacking Instructions Unpacking InstructionsTable of Contents System Descriptions Principles of OperationGeneral Description Cleaning InstallationFinal Installation MaintenanceInput Ordering InformationSystem Wiring Diagram Loop Power Option Relay Option Dimensional Drawings WARRANTY/DISCLAIMER Shop online at omega.com