Enlight EN-898X user manual

Page 43

Note

1.First set up this compress package (SCSI manager), then load in the 8721,8982 or 8983 device and those devices could be automatically installed.

2.If the machine is installed the device of 8721, 8982 or 8983, and then setup this compress package, the device manager will be installed by the system by hand and the "?" won’t

disappear.

3.

43

Image 43
Contents Addenda 898X series compare………………………45 Installing the server board………………………….7Introduction 8981 8982 8983 Specifications Removing the Cover Installing the Server BoardTo mount the server board Mounting the Server BoardTo mount the CPU bracket To remove the CPU bracketInsulation PAD As follows To reattach the cover Adding Components to the Server BoardReattaching the Cover Cabling the Server BoardHard Drives Installing Optional Peripherals and Devices8982/8983 8981 Page CD-ROM/Floppy8981/8982 Installing CD-ROM/FDDTo fix power supply Power SupplyCooling fans8981 Cooling FansBack plane cooling fans8982/8983 Rear side cooling fans8982/8983 L1/R1 the left fan L2/R2 the second fan L3/R3 the right fan Page 898X C01 PCI Slot898X D01 898X E01 6HDD Back Plane Installing 898X in the cabinetAbout the Back Plane 8982/89836HDDID Select(2 ID group) S1 off Device Status Indicator LightBack Plane LED ID Select(4 ID group) 3HDD Back PlaneOpen Short 8982/8983 Connecting the control planeAbout the LED panel and front panel LED panel Power LED WhenFront panel About Screws About SAF-TE8982/8983 Usage of Scsi Manager Scsi MANAGER8982/8983Page Auto Update Auto-updating Operation Guide: Disable speaker beepingScsi LUN ID Page Scsi COMMAND: SAF-TE COMMAND: Program Updating Auto-update and Manual-update Configuration Page Page 898X series compare Addenda