Telenetics MIU9.6 manual T7 Initiate RDL with Local Self Test See Figure, Result Codes Description

Page 24

&T7 INITIATE RDL WITH LOCAL SELF TEST (See Figure 5)

This is a system test, end to end.

The command is valid only if the modems are in the command state with a connection established.

Configure the remote modem with an AT&T4 command so that it will honor a remote digital loopback request.

Enter AT&T7 at the local modem and it will send a digital loopback request to the remote modem. After the RDL acknowledgment signal is received from the remote modem, DSR is turned off (if &S1 is in effect), the on-line state is entered, an OK result code is sent to the DTE, and the test timer is set to the value in S18. While the test is active, the local modem sends a test message to the remote modem and counts the errors in the received (looped back) signal. The modems stay in the command state during the test. When the test is terminated (except by a loss of carrier), the local modem sends the release signal to the remote modem, as in &T6, and reports the three-digit error count to the DTE.

The information text is followed by an OK result code. The test is terminated by loss of carrier, or an H0, &T0, or Z command, and by the S18 timer running out.

RESULT CODES

DESCRIPTION

OK

When command executed is started.

OK

After error count is sent to DTE (&T1,

 

&T3, &T6, &T7 or &T8).

ERROR

If not in on-line command state.

ERROR

If the RDL signal is not acknowledged.

MIU Installation, Operation & Diagnostics Edition: March 30, 1998

Page 22

Image 24
Contents Installation, Operation & Diagnostics Telenetics Corporation Table of Contents Standards USAProduct Overview MIU Installation, Operation & Diagnostics Edition March 30 General Product Specifications MIU28.8Power Modes Mode Description Power Consumption Power OnPower Down SleepModem Specifications MIU2.4 MIU9.6 MIU14.4 MIU28.8Power Connections Serial Data Port PIN-OUTS DIP Switch Settings Not Applicable LED Indicator Auto Reset FeatureAuto Dial Feature Outline Drawing & Mounting Modem Configuration Factory Configuration ~ MIU2.4 Active Profile Stored ProfileTelephone Numbers &Z0= Factory Configuration ~ MIU9.6 Active Profile Telephone NumbersFactory Configuration ~ MIU14.4 Active Profile Factory Configuration ~ MIU28.8 Active Profile Diagnostics T0 Terminate Test in Progress T1 Initiate Local Analog Loopback See FigureResult Code Description No Function Perform Local Digital Loopback See FigureGrant Remote Digital Loopback RDL Requests T5 Deny RDL Requests T6 Initiate Remote Digital Loopback See FigureT7 Initiate RDL with Local Self Test See Figure Result Codes DescriptionT8 Local Loopback with Self Test See Figure T6, &T7, or if on-lineMIU Installation, Operation & Diagnostics Edition March 30 MIU Installation, Operation & Diagnostics Edition March 30 MIU Installation, Operation & Diagnostics Edition March 30 Received Line Signal Quality S86 Connection Failure CauseMIU Installation, Operation & Diagnostics Edition March 30 MIU Installation, Operation & Diagnostics Edition March 30