King Kutter phd-09s, phd-12s, phd-06s manual Assembly Instructions

Page 10

ASSEMBLY INSTRUCTIONS

1.Attach arch to lower hitch points. If tractor has Category 2 hitch, use bushings provided on arch pins.

2.Attach arch to boom with pin and cotter pins provided.

3.Attach gearbox to boom with pins and cotter pins provided.

4.Attach PTO shield to top of gearbox with bolts provided.

5.Prepare PTO for attachment.

a. Remove any foriegn material or paint from input shaft ongearbox.

b. Separate PTO driveshaft. Use a good grade of gun grease and put a light coat on U-joint drive shaft. Then insert into drive tube.

c. Attach PTO to gearbox.

d. Make sure roll pin is in groove of input shaft but not tight against bot- tom of groove so yoke will rotate freely.

e. Put in shear bolt.

f. Place snap yoke on tractor PTO.

g. Raise and lower the boom through it’s complete operation arch and check that nothing interferes with the operation. If anything interferes, make the proper three-point adjustments.

6.Attach the output shaft shield to lower gearbox.

7.Attach the auger to gearbox using bolts, lockwashers, and hexnuts provided.

10

Image 10
Contents Post Hole Diggers Page To the Purchaser Customer InformationPage Contents Safety Equipment Safety Guidelines Page Page Assembly Instructions Operating Instructions Lubrication ScheduleSafety Training Starting and Stopping Safety PrepartionOperational Safety Operational Safety Transport Safety Storage SafetyPHD-S PTO Post Hole Digger PHD Parts Limited Warranty