Chapter 2 Installation and Maintenance
Only trained service personnel should install and maintain the Power Supply.
Prior to installing the Power Supply, an APC approved enclosure must be installed and AC line voltage must be routed to the enclosure. Local, state, federal and/or National Electric Code (NEC) regulations regarding location, permits and electrical wiring must be adhered to.
Do not operate the Power Supply where the temperature and humidity are outside the specified limits. See Specifications in this manual.
Front View | Side View |
Installing the Power Supply
Enclosure Installation
Bottom View
Line Input | Cable Adapter |
Output Indicator
Ground Lug
Mounting Screw
1.Remove the screw holding the key on the rear of the chassis.
2.Remove the
3.Remove the mounting bracket from the housing by pulling down.
4.Set the Power Supply and the key aside.
5.Refer to Specifications in this manual for Power Supply dimensions.
3 |