APC SURTA48XLBPJ user manual Tower Installation

Page 4

Tower Installation

2.Complete this step if adding battery pack(s) to an existing tower system.

a.Turn Off the UPS and disconnect all equipment. Refer to the UPS user manual for instructions.

b.Remove bezels, battery covers, and battery modules from all previously installed equipment. For additional instructions, refer to the UPS user manual and “Transporting the Battery Pack to Another Location” on page 10.

c.Remove the feet from the last battery pack .

d.Attach and mount the feet to the new battery pack(s) as shown.

e.Attach new battery pack(s) to the existing assembly by joining the two assemblies and securing screws in the foot extensions .

f.Remove the top covers as shown. Install clips between the chassis, then install the top covers.

 

 

 

 

 

 

x2

 

 

 

 

 

 

 

 

 

 

 

 

x2

x2

 

 

 

 

 

 

 

 

 

 

 

x2

x2

 

3.Go to “Battery Pack and UPS Connection Procedure” on page 7 to:

Connect the TVSS ground wire.

Connect the UPS to the battery pack.

Connect battery packs to one another.

4.To complete the installation:

a. Install and connect the UPS battery module. b. Install the UPS battery cover and bezel .

4

Smart-UPS RT SURTA48XLBP/SURTA48XLBPJ External Battery Pack User Manual

Image 4
Contents Introduction/Before Installation Contact Information Safety InformationUnpacking and Equipment Placement About this ManualPre-installation Procedure Tower Installation  Tower Installation Rack-mount Installation Rack-mount Installation Battery Pack and UPS Connection Procedure Connectors Type DescriptionTvss GND Terminal Mode Configuration Operation and TroubleshootingStorage, Transport, and Service To Install a Replacement BatteryTransporting the Battery Pack to Another Location StorageService Copyright Notice Limited Warranty990-1857 06/2004