VCAUTION
CONDUCTING DIELECTRIC AND/OR
Do not perform dielectric or high potential
tests with the TPS3 unit installed.
V DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep Out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
TPS3 09 Installation Instructions
• Meet all National and Local codes (NEC® Article 285 and UL |
1449 address SPDs) |
• Confirm System voltage to SPD voltage (120V SPD will fail |
instantly on 240V, 277V, etc.) |
• Mount SPD as close to panel or equipment as possible to keep |
leads short (long leads hurt performance substantially) |
• Ensure leads are as short and straight as possible, including |
neutral and ground. If using a breaker, use a breaker position |
that is close to the SPD and the panel’s neutral & ground |
• If using a breaker, recommended breaker size is 30A due to |
10 AWG conductor |
• Make sure system is grounded per NEC® and clear of faults |
before energizing SPD (inadvertent system problem may fail |
SPD). |
• Never |
A B C
BREAKER
N | G |
•Use closest breaker to SPD
•Locate SPD close to intended breaker
•Keep Leads Short as Possible
•Avoid Sharp Bends
• Do not install the TPS3 09 through the bottom of a NEMA |
3R panel. Dripping water will prematurely fail the SPD. |
1. Use voltmeter to check voltages and ensure correct SPD. See Data |
Figure 4: Typical Flush Mount Installation
Mounting Surface
Mounting Screws
| Sheet for specs & |
2. | Determine Mounting location – weather resistant equipment |
| may be required |
3. | If SPD has optional Dry Contact and Flush Mount Kit, |
| their installation. See Figures 4&6. (If flush mounting, be careful |
(4 places, through mountingplate into mounting surface, screws not provided)
Removed Material
Flush Mount Plate
SPD
| to not drop SPD into wall) | |
4. | Remove power from panel/source. Confirm panel/source is | |
| deenergized. | |
5. | Identify breaker location and SPD location. Position SPD such that | |
| LEDs are best visible. | |
6. | Mount SPD – weather resistant applications require additional | |
| sealing, | |
| Remove an appropriately sized knockout from panel. | |
| Connect conductors as appropriate – short and straight as possible | |
| ||
| Note that the metallic connection hub is not grounded within the SPD | |
|
| and proper grounding requires connection of the green conductor |
|
| ground. |
7. | Label or mark conductors as appropriate (neutral: white, ground: | |
| green, energized: black, | |
8. | Make sure system is bonded per NEC® and is clear of hazards or | |
| faults before energizing | |
| #1 cause of SPD failures) | |
9. | Energize and confirm proper operation of green LED indicators | |
| and/or options. |
Flush Mount Kit Screws
Phase, Ground,
and Neutral Wires
Figure 5: Lead Lengths
Leads: Short & Straight
Cut Excess; Do Not Coil or Loop
X | • | CUT OFF EXCESS |
| LENGTH | |
• | DO NOT LOOP OR | |
Not |
| COIL |
Good |
|
|
Goodp | • | SHORT & |
| STRAIGHT | |
|
|