Notice:
I. | Recovery switch cable is next to FDD port, and the black cable face to the top of |
| Chassis. |
II.Intrusion switches cable face to front bezel of chassis.
Remove HDD
Process:
1.Remove Master HDD from the first HDD location.
2.Remove Slave HDD from the second HDD location. (Optional by SKU)
Slave HDD
Master HDD
3.
44