Cable Connections
Please refer to the
Equipment
Tray
Base Box
CablesCables
Step 1. Pull all cables down through the | Step 2. | Pull all cables down through the |
| ||
| Step 3. | Attach all cables to the installed |
|
| projector. |
Side Panel Installation
M4 x 8mm
Security Screw
Side Panel
Side Panel
| M3 Security |
Side Panel | Wrench |
|
Step 1. Attach the two side panels using eight (8) M4 x 8mm security screws.
Step 2. Tighten these screws using the M5 security wrench.
Installation Instructions | Page 7 |