Premier Mounts GB-PIPE1B installation instructions Cable Connections, Side Panel Installation

Page 7

GB-PIPE1

Cable Connections

Please refer to the PDS-PLUS Installation Instructions before proceeding with the following steps.

Equipment

Tray

PDS-PLUS

Base Box

CablesCables

Step 1. Pull all cables down through the

Step 2.

Pull all cables down through the

PDS-PLUS base box.

 

PDS-PLUS projector plate.

 

Step 3.

Attach all cables to the installed

 

 

projector.

Side Panel Installation

M4 x 8mm

Security Screw

Side Panel

Side Panel

 

M3 Security

Side Panel

Wrench

 

Step 1. Attach the two side panels using eight (8) M4 x 8mm security screws.

Step 2. Tighten these screws using the M5 security wrench.

Installation Instructions

Page 7

Image 7 Contents
Installation Instructions Installation Instructions Installation Tools Parts ListGB-PIPE1 Installation 2 NPT Installation PDS-PLUS Installation without NPT Optional Cable Connections Side Panel InstallationTechnical Specifications Lateral Shift AdjustmentWhat Premier Mounts Will Do WarrantyWhat is Not Covered Limitations What Customers Must Do for Limited Warranty Service