Elite Screens REV043010-JA manual Setup Procedure, Two Section Frame

Page 2

Setup Procedure

The frame and supports are made of 1 3/8” aluminum tubing with an anodized finish. Please follow the instructions in this package. With proper care, your QuickStand screen will provide many years of reliable service.

Two Section Frame

(For presentation screens that are less than 120” in diagonal measurement)

1.Take the frame out of the case and remove its wrappings. Unfold the main joints as shown in (fig 1).

2.Once the main joints are unfolded, make sure that the snap latches “click” into the locked position. The frame should now be fully elongated as in (fig2). *Note: The snap latches will automatically lock when the joint is straightened. Press the snap latch button in order to release the lock.

3.While holding the bottom of the frame in place, lift the top of the frame to unfold the sides which will cause the snap latches lock when fully extended. Secure the corner braces into the locked position. The screen frame should now be fully opened as in (fig 3).

Top

Top

Snap latch

Lock down the corners

Rev043010-JA

www.elitescreenscom

fig 1

fig 2

Snap latch

fig 3

info@elitescreens.com

Image 2
Contents QuickStand Series Setup Procedure Two Section FrameThree Section Frame Standard T-Leg Support Locking bolt Frame spacer Frame spacer Attaching the Frame to its Supports Folding the Screen material for proper packingCleaning Attaching the Screen once it is unpackedParts List Warranty PolicyContacts