Setup Procedure
The frame and supports are made of 1 3/8” aluminum tubing with an anodized finish. Please follow the instructions in this package. With proper care, your QuickStand screen will provide many years of reliable service.
Two Section Frame
(For presentation screens that are less than 120” in diagonal measurement)
1.Take the frame out of the case and remove its wrappings. Unfold the main joints as shown in (fig 1).
2.Once the main joints are unfolded, make sure that the snap latches “click” into the locked position. The frame should now be fully elongated as in (fig2). *Note: The snap latches will automatically lock when the joint is straightened. Press the snap latch button in order to release the lock.
3.While holding the bottom of the frame in place, lift the top of the frame to unfold the sides which will cause the snap latches lock when fully extended. Secure the corner braces into the locked position. The screen frame should now be fully opened as in (fig 3).
Top
Top
Snap latch
Lock down the corners
www.elitescreenscom
fig 1
fig 2
Snap latch
fig 3
info@elitescreens.com