Allied Telesis AT-6101GP manual Ethernet Cable Installation

Page 27

Ethernet Cable Installation

AT-6101 PoE Injector Installation Guide

2.Install the two wall anchors into the wall at the locations marked in the previous step. The anchors require 0.635 mm (0.25 in.) holes.

3.Hold the power injector on the wall so that the mounting holes align with the anchors previously installed. Secure the unit with the two wall mounting screws as shown in Figure 6.

Figure 6. Securing the AT-6101GP PoE Injector to the Wall

4. Go to ”Ethernet Cable Installation” for the next step in the installation.

1.Install two Ethernet cables into the AT-6101GP RJ-45 Ethernet ports marked DATA OUT and DATA IN as shown in Figure 7.

Figure 7. Connecting Ethernet Cables

2.Connect the DATA OUT port cable to the PoE device. Connect the DATA IN port cable to the other end device in your network.

23

Image 27
Contents AT-6101GP PoE Injector Installation Guide Page This product meets the following standards Electrical Safety and Emissions StandardsTranslated Safety Statements Table of Contents Contents List of Figures Figures List of Tables Tables Preface Document Conventions Allied Telesis Contact Information Preface Chapter OverviewAT-6101GP PoE Injector FeaturesCable Requirements Port Pinouts Hardware Description AC Power Input ConnectorLED LEDsOverview Installation Reviewing Safety Precautions AT-6101 PoE Injector Installation Guide Choosing a Site for the AT-6101GP PoE Injector AT-6101GP PoE Injector Items Unpacking the AT-6101GP PoE InjectorTable Top Installation Wall Installation Installation ProceduresEthernet Cable Installation AC Power Cord Installation Troubleshooting Troubleshooting Power Specifications Technical SpecificationsPhysical Specifications Environmental SpecificationsRJ-45 Twisted Pair Port Pinouts CertificationsPinout Pair Appendix a Technical Specifications