DFE-500TX Ethernet PC Card User's Guide
5.Remove the
>A: \DIAG\DIAG500.EXE
and <RETURN>. The opening screen of the Verification/Diagnostic program will appear onscreen at the second station. Key <RETURN> to bring up the Configuration Data and Diagnostic Menu onscreen at the second station. Follow the cues at the foot of the screen to select and run the Network Diagnostic program at the second station. The second station then begins broadcasting test packets, and at the same time is also ready to receive and return test signals transmitted from the primary station’s newly installed
7.Return to the primary station and follow the cues at the foot of the screen to select and run the Network Diagnostic program. Observe the “Packets Transmitted” and “Packets Received” lines to see that they track together (always show equal count numbers), which verifies normal network operation.
Hiya, Normal!
Hiya, Heading 1!
Hiya, Heading 2!
Most likely causes of failure in any of the verification/diagnostic tests are incorrect option settings, option settings that conflict with the settings of
14