Elite Screens PowerMax manual Built in 3 Way Control Swwitch

Page 9

Built in 3 Way Control Swwitch

1.The PowerMax Series comes with a 3 Way Control Switch attached to the Power Cord, which is 3.5 meters in length.

2.Use the provided Bubble Leveel (f) to ensure the screen is level before plugging in the power cord.

3 Way Control

 

Up/Stop/Down

Bubble Level (f)

Switch

 

Remove Screen from Mounting Brackets

1.Pull down on the Mounting Bracket Release Tab and remove the bottom of the case first, away from the wall/ceiling, followeed by the top of the case.

Release Tab

Pull Bottom of case first away from wall/ceiling.

Rev.123011-AS

 

 

www.elitescreens.com

info@elitescreens.com

9

Image 9
Contents Powermax Series Important Safety & Warning Precautions Pre-Installation Installation WarningQTY Hardware Partts List for the PowerMax SeriesFlush Mount to the Wall Installation InstructionsCase Slot Flush Mount to the Ceiling Suspended Ceiling using Chains additional hardware required Built in 3 Way Control Swwitch ZPM-RT Optional Remote Control Kit for PowerMax Series ZPM-RT Installation & Control Instructions Orange Wire = Down Way Wall Switch C PowerMax Dimension Table Warranty Policy Contact Information