PYLE Audio PSW112 manual Brick, Concrete and Stone wallFig 2c, Hanging display

Page 1

Brick, Concrete and Stone wall(Fig 2c):

Using the wall mount as template to mark 6 holes location on the wall. There holes are located at the top row of the slots and three more are located at the bottom row. The outer holes must be fall to the left and right of the two holes in the middle of the

mount. Please make sure these holes are level and at least 6” between any two lines. Pre-drill these holes with a 10mm drill bit to at least 80mm deep hole. Insert Wall

anchors(P) into each of these holes. Attach the wall mount to the wall using 6 Long bolts(O) and washers(Q).

 

1

 

 

Q

O

 

 

Fig 2b

Fig 2c

 

Step 3: Hanging display

Firstly lift the bracket mounted display over the wall mount. And then hook the brackets over the top of the wall mount. Rotate the display let the bottom of the brackets hook over the bottom of wall mount, as shown in Fig.3a. Then put safe bolts into the bottom of the brackets and lock it, as shown in Fig.3b.

Warning: Some TV require two people to lift, as we are not responsible for any personal injur y or product damage due to mishandling.

 

2,3

 

 

1

4

 

 

Fig 3a

 

Fig 3b

-8-

Fixed Flat Panel TV Bracket

Multifunctional double deck wall mount

INSTALLATION GUIDE

Item No.:PSW112

Easy installing: Just hang up the display

Safety: locking by spining bolt on the bottom

Max load capacity:75kg(165lbs

TV size range: 36"~55"

,

IMPORTANT: If don’t understand about right install ways, please consult to normal installing specialist.

Image 1
Contents Hanging display Brick, Concrete and Stone wallFig 2cAttach mount to wall EyelevelWooden wallFig 2b M6 Fig bit M8 Fig bit M4 Fig bit M5 Fig bitAttach bracket to TV M4 Fig bit M5 Fig bit M6 Fig bit M8 Fig bit M4 Fig bit M5 Fig bit M6,1/4 "-20 "Fig bit M8 Fig bit