Tatung TBM-1403, TBM-2003, TBM-1503, TBM-0903, TBM-1203, TBM-1703 Operation, Operating Instructions

Page 12

OPERATION

OPERATING INSTRUCTIONS

1.Place the monitor where you plan to use it.

2.This monitor can be operated between 100VAC to 240VAC.

3.Plug the power cord into AC RECEPTACLE on the wall.

4.Link the A/V terminal from your devices into the audio / video in (RC A / BNC) Connectors of the monitor.

5.Turn your device system power switch ON. then turn the monitor power switch ON. The power indicator will be ON at this moment.

6.Allow about 30 seconds for the display tube to warm up, then the image of the Display should appear on the screen,and power -ON LED indicator luminant.

7.The monitor will detect the frequency of the input signal automatically, and the Display image is able to be adjusted through the function VR on front control panel.

11

Image 12
Contents Operating Instructions Table of Contents Safety Precautions FCC InformationPage General Features Standard System Components and Attachments MonitorTBM0903 Front and Rear View Front ViewTBM1203 Front and Rear View TBM1403 Front and Rear View TBM1503 Front and Rear View TBM1703 Front and Rear View TBM2003 Front and Rear View Operation Operating InstructionsTatung Company of America EL Presidio ST Long BEACH,CA