FCI Home Appliances 12-64B, 8-66B manual Pre-Installation, Flow Element Installation

Page 1

24 Hour Factory Service Hot Line: 1 (800) 854-1993

Document 06EN003322 Rev. -

 

 

12-64B, 8-66B Installation, Operation and

Troubleshooting Guide

Step 1. Pre-Installation

A.To get the best results, the sensor should be mounted 20 pipe diameters downstream from any flow disturbance (valve, pipe elbow) and 10 pipe diameters upstream from any disturbance.

The instrument tag shows the model number, tag number (if noted on the order) and serial number along with other important safety information. Compare this information with the appropriate pipe installation drawings to be sure the instrument is the correct configuration. Match the tag serial number on the enclosure, flow element and control circuit.

Tag Location

On the top side of the local enclosure

B.Verify the serial numbers on the enclosures, flow element and electronics (control circuit) match. The instrument may not work if the serial numbers do not match.

Flow Element Serial Number.

Also Showing Sensor Orientation Flat. (Located near the enclosure.

It is also on the enclosure tag.)

Electronics Serial Number

C.Recommended installation/troubleshooting tools are a 1-3/8 inch open ended wrench to fit the NPT connection, a small flat blade screw driver for manipulating potentiometers, a medium flat blade screwdriver for tightening connections, 3 mm allen wrench for CENELEC approved instruments, and a DVM for Ohm/Voltage measurements.

Step 2. Flow Element Installation

Alert: DO NOT change the orientation of the flow element in the enclosure as the interconnecting RTD and heater wiring could be stressed and damaged. DO NOT apply any torque to the flow element enclosure - only apply to the pipe surface itself.

Install the flow element, with the Flat Up and Level (shown above) or parallel to the flow media (±2°) for top mounted instruments. The enclosure, flow element and electronic control circuit card serial numbers should all match.

Image 1
Contents Flow Element Installation Pre-InstallationWiring the Instrument Wiring PreparationAlarm Set Point Procedure Wiring Diagram Wiring the Instrument into the Customer’s ApplicationOperation Alarm Set Point Procedure TroubleshootingOther Quick Checks