FINAL SYSTEM CHECK
Be sure all inlets are closed and soil bag is in place. Check switch on power unit for manual on/off operation.
Check each wall inlet to be sure contacts activate power unit when hose is inserted. A short piece of wire can be used to short contacts in wall inlet together to activate power unit. Check each wall inlet and tubing connection for air leaks. Check power unit for leaks around inlet tube and dirt receptacle.
FIGURE 5
MODEL 365
DOUBLE FLANGED
TEE
WALL
INLET
| CUT OFF | MOUNTING | |
| BRACKET | ||
WALL | APPROX. | ||
| |||
| 3⁄4” OF WALL INLET |
| |
| TUBE | FIGURE 6 | |
|
|
| INLET | 361 |
FLANGE | SEAL | MOUNTING |
FITTING |
| BRACKET |
PLASTER
FRAME
29⁄16”
WALL
INLET
31⁄16”
FIGURE 7
Product specifications subject to change without notice.
4820 Red Bank Road, Cincinnati, Ohio 45227
1140 Tristar Drive, Mississauga, Ontario Canada L5T 1H9
Printed in U.S.A., Rev.3/01, Part No. 81923