Advantech 120 operation manual Normal Operation, Unstow

Page 12

D Connector Signal RJ-11 Connector

Pin 5 Ground Pin 1

Pin 3 Term Data OUT Pin 2

Pin 2 Term Data IN Pin 3

Pin 6 Not Used Pin 4

Pin 1 Common Pin 5

Do Not Connect + 5VDC @ 100 mA Pin 6

This diagram shows the pin order when viewed from plug cable entry.

2 Normal Operation

The i-Point's normal "deploy" operation is made up of several stages.

There is information provided at some stages which can be helpful to diagnose a system having problems.

First start to capture the information on the serial port. (In hyper-terminal use the "Transfer\Capture text" menu and provide a filename.) If you need assistance interpreting the information then it can be e-mailed to support.europe@AdvantechWireless.com .

Then type the command "debugport 0". This will instruct the system to provide additional diagnostic data.

Then type the command "deploy".

2.1 Unstow

No useful information about this step. The antenna is driven from the current position to the "unstow" position.

2.2 Orientation

During this step 3 pieces of information are gathered.

1.The GPS is read to get the current location on earth.

2.The magnetometer is read to get a heading angle for the platform. This is the geographical direction that the antenna is pointing at the unstow position.

3.Then the antenna is driven to an elevation angle above the geostationary arc to take a "noise floor" measurement.

Once this drive has been completed the GPS and the magnetometer readings can be checked.

To see the gps data type the command "gps". Check that the last line indicates that the signal is valid.

ENTERPRISE120

UK Office Phone

+44 1480 357 600

Fax +44 1480 357 601

E-mailSales.UK@AdvantechWireless.com

Page 12 of 14

 

US Office Phone

+1 480 839 4136

Fax +1 480 839 0860

Website: www.AdvantechWireless.com

 

 

Canada Office Phone +1 514 420 0045 Fax +1 514 420 0073

 

 

Ref: PM-ENT120-002-11022

Image 12
Contents Issue Table of Contents Installation and Set-up Overview Technical DescriptionPoint ACU Controller Installation User Interface Unit UIU Maintenance Spares and Replacement PartsManual Over Ride ElevationOverall Dimensions Mounting Bracket Positions Receive Point Operation Monitoring Serial CommunicationRJ-11 to 9-PIN D-Type Socket Adapter Cable Normal Operation UnstowGoto target satellite GUI Program