
D
D B
AB
D D
B
PICTURE 1
B
F
STEP 1: See PICTURE 1. Attach the FOUR LEG POSTS (B) to their designated spots on the TOP RING
(A) using the FOUR LONG SCREWS (C).
Attach the FOUR DOWELS WITH TWO HOLES (D) using FOUR SHORT SCREWS (E). The positions of these four dowels may vary from shown in Picture 1.
STEP 2: See PICTURE 2. Turn the crib upside down. Insert the FOUR LEG POSTS (B) through the large holes on the BOTTOM RING (F) and slide the bottom ring down until it rests on the DOWELS WITH TWO HOLES (D).
Be sure screw and dowel holes on the bottom ring are in the right place, and the white side of the bottom platform is facing down (white side will face up when the crib is in the upright position).
Starting at any dowel, work your way around the ring and alternately screw down the FOUR DOWELS WITH TWO HOLES (D) using FOUR SHORT SCREWS (E) and insert the remaining ELEVEN DOWELS (D) sandwiched between the top and bottom rings.
There is one hole for the canopy pole that you will leave open.
STEP 3: See PICTURE 3. Turn the crib right side up. Insert the FOUR CASTER WHEELS (G) into the holes on the bottom of the LEG POSTS (B). Grasp each leg and gently but firmly press each wheel against the floor to snap it into place.
PICTURE 2
G
G
G
PICTURE 3 | G |
|
Page 2 of 3 | 1.0/0705 |