Hoist Fitness RPL-5101-A owner manual Maintenance Schedule, Latest Date Entry

Page 34

OWNER'S MANUAL

MAINTENANCE SCHEDULE

 

 

ROUTINE

COMMERCIAL

HOME

 

LATEST DATE ENTRY

 

 

 

 

MAINTENANCE

MAINTENANCE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect;

 

 

 

 

 

 

 

 

 

 

 

 

 

Links, Pull Pins, Snap Locks,

DAILY

WEEKLY

 

 

 

 

 

 

 

 

 

 

 

Swivels, Weight Stack Pins

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean;

DAILY

WEEKLY

 

 

 

 

 

 

 

 

 

 

 

Upholstery

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect;

 

 

 

 

 

 

 

 

 

 

 

 

 

Cables or Belts and their

DAILY

WEEKLY

 

 

 

 

 

 

 

 

 

 

 

tension

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect;

WEEKLY

3 MONTHS

 

 

 

 

 

 

 

 

 

 

 

Accessory Bars, and Handles

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect;

WEEKLY

3 MONTHS

 

 

 

 

 

 

 

 

 

 

 

All Decals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect;

 

 

 

 

 

 

 

 

 

 

 

 

 

All Nuts and Bolts, Tighten if needed

WEEKLY

3 MONTHS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inspect;

WEEKLY

3 MONTHS

 

 

 

 

 

 

 

 

 

 

 

Anti-Skid Surface

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean & Lubricate;

 

 

 

 

 

 

 

 

 

 

 

 

 

Guide Rods with a Teflon (PTFE)

MONTHLY

3 MONTHS

 

 

 

 

 

 

 

 

 

 

 

based lubricant (Superlube)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lubricate;

 

 

 

 

 

 

 

 

 

 

 

 

 

Seat Sleeves, Turcite Bushings,

MONTHLY

3 MONTHS

 

 

 

 

 

 

 

 

 

 

 

Linear Bearing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean and Wax;

6 MONTHS

YEARLY

 

 

 

 

 

 

 

 

 

 

 

All Glossy Finishes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Repack with Grease;

6 MONTHS

YEARLY

 

 

 

 

 

 

 

 

 

 

 

Linear Bearings

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace;

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cables, Belts and Connecting Parts

YEARLY

3 YEARS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Your equipment comes with a commercial maintenance decal.

For personal, in home use, please follow the home maintenance schedule listed above.

PAGE 33

RPL-5101-A ASSEMBLY

Image 34
Contents RPL-5101-A Contents Instructions Tools RequiredThis page WAS Intentionally Left Blank Frame Assembly Hand Tighten Hardware 7111 Frame Assembly Frame Assembly 982 Frame Assembly Frame Assembly Frame Assembly Frame Assembly Frame Assembly Frame Assembly Frame Assembly Frame Assembly Frame Assembly Machine Adjustment Major AdjustmentPRE-ASSEMBLY Decal Placement Decal Reference Serial # Decal This page WAS Intentionally Left Blank Head PAD Assembly Part ListItem no Part Number Description UNC Thin Nylock NUT WZ Abbreviations Bolt Sizing Chart Fhcs Shcs HHB 123 Bhcs Washer Sizing Chart Flat Washer026-01M211T 1/4 Long Heavy Flanged Spacer Maintenance Schedule Latest Date EntryHoist Fitness Systems General Maintenance Information Links, Pull-Pins, Snap Hooks, Swivels, Weight Stack PinsWeight Training Tips Enjoy your RPL-5101-A Hoist Fitness SystemWeight Training Exercise LOG Hoist Fitness Systems Limited Lifetime Warranty