Fisher-Price C6994 instruction sheet Platform

Page 3

Assembly

1 2

#4 x 1/2" Screw

PLAIN TREES

PLATFORM

WITH FENCE

 

3

MOUNTAIN TOP

4

SNOWY TREES

 

CHALET

 

5

LOWER SPIRAL

TRACK

UPPER SPIRAL TRACK

Slide the tab on the upper spiral track into

Fit the two mountain halves together, as shown.

Insert six screws into the mountain assembly and tighten the screws with a Phillips screw- driver. Do not over-tighten.

6

SHORTESTLONGEST

“Snap” the platform with the fence onto the mountain assembly .

“Snap” the plain trees into the mountain assembly.

7

PLAIN GUARD RAIL

 

“Snap” the mountain top onto the mountain assembly.

8

GUARDRAIL WITH TABS

“Snap” the snowy trees and the chalet into the mountain top.

9

TUNNEL TRACK SUPPORT

the groove in the lower spiral track to join the two parts.

UPPER RAMP

10

TAB

LOWER RAMP

#4 x 1/2" Screw

 

"Snap" the support pillars to

 

 

“Snap” the plain

 

the underside of the spiral

 

 

guardrail into the

 

track assembly, as shown,

 

 

slots in the upper

 

working from the shortest

 

 

spiral track.

 

pillar to the longest.

 

 

 

 

 

 

 

 

Locate the other guardrail with the tabs.

Fit a tab on one end of the guardrail under the lower spiral track, as shown.

Bend the guardrail slightly to fit the other two tabs to the lower spiral track.

“Snap” the tunnel track support to the tunnel.

Fit the tabs on the upper ramp into the slots in the lower ramp.

Insert two screws into the upper ramp. Tighten two screws with a Phillips screwdriver.

Do not over-tighten.

Assembly is now complete!

Image 3
Contents Mile High Mountain Abcdef Ghijkl Mnopqr Stuv PartsPlatform Track Layouts Load the Crate For layout ideas visit GeoTrax section