
Assembly ![]()
1 ![]()

2
#4 x 1/2" Screw | PLAIN TREES |
PLATFORM | |
WITH FENCE |
|
3 | MOUNTAIN TOP |
4 | SNOWY TREES |
| |
CHALET |
|
5
LOWER SPIRAL
TRACK
UPPER SPIRAL TRACK
Slide the tab on the upper spiral track into
•Fit the two mountain halves together, as shown.
•Insert six screws into the mountain assembly and tighten the screws with a Phillips screw- driver. Do not
6
SHORTESTLONGEST
•“Snap” the platform with the fence onto the mountain assembly .
•“Snap” the plain trees into the mountain assembly.
7 | PLAIN GUARD RAIL |
|
“Snap” the mountain top onto the mountain assembly.
8
GUARDRAIL WITH TABS
“Snap” the snowy trees and the chalet into the mountain top.
9
TUNNEL TRACK SUPPORT
the groove in the lower spiral track to join the two parts.
UPPER RAMP
10
TAB
LOWER RAMP
#4 x 1/2" Screw
| "Snap" the support pillars to |
|
| “Snap” the plain |
| the underside of the spiral |
|
| guardrail into the |
| track assembly, as shown, |
|
| slots in the upper |
| working from the shortest |
|
| spiral track. |
| pillar to the longest. |
|
|
|
|
|
|
|
|
•Locate the other guardrail with the tabs.
•Fit a tab on one end of the guardrail under the lower spiral track, as shown.
•Bend the guardrail slightly to fit the other two tabs to the lower spiral track.
“Snap” the tunnel track support to the tunnel.
•Fit the tabs on the upper ramp into the slots in the lower ramp.
•Insert two screws into the upper ramp. Tighten two screws with a Phillips screwdriver.
Do not
Assembly is now complete!