Pelco C416M-C operation manual Maintenance, Dome Drive Removal

Page 11

4.0 MAINTENANCE

Regularly scheduled maintenance will prolong the operational life and appearance of the equipment.

Clean the dome with a nonabrasive cleaning cloth and antistatic cleaner that is safe for use on acrylic plastic. Do not use kerosene or similar substances that can scratch the surface.

The dome drive should also be inspected and any dust and debris blown off. Pay special attention to the gear drives. After removing dust and debris a film of silicone lubricant should be applied to the gears for prolonged life. It is recommended that the unit be checked at six-month intervals.

No adjustments are required.

4.1DOME DRIVE REMOVAL

1.Remove the back box trim ring or bezel. To remove a bezel, turn it about 1/2" (1.27 cm) counterclockwise and pull down.

2.Turn off the power switch inside the back box.

3.Remove the hairpin clips from the latches.

4.Open one of the latches.

5.Grasp the unit with one hand to prepare for the 10- to 13-pound (4.5 to 5.9 kg) load.

6.Open the other latch and lower the dome drive.

Pelco Manual C416M-C (1/98)

11

Image 11
Contents Listed Contents Manual # Date Comments Revision HistoryThis page intentionally left blank General Important Safeguards and WarningsRecommended Tools Unpacking InstructionsDD08E2L DescriptionModels DD08C2LPan Limits Stops Only Two Shown InstallationDome Drive Upper Bracket Back BOXPelco Manual C416M-C 1/98 Dome Drive Removal MaintenanceVAC Back Box Wiring Diagram Wiring DiagramsPelco Manual C416M-C 1/98 Dome Drive Wiring Diagram DD08 Series Dome Drive Exploded Assembly Diagram Mechanical Exploded Assembly DiagramsZHSHIM.047 SWI111SM1DD08 Series Dome Drive Exploded Assembly Diagram Hardware ZH8LWSIS ZH4LWSISZH6LWSIS ZH1/4LWSSLBNC SpecificationsWarranty Warranty and Return Information