American Telecom manual Technical Document Charger Installation, SL PTG012, Rear View

Page 2

AMERI*CAN TELECOM INC.

Technical Document

Charger Installation

The SL PTG012 SpectraLink Phone and Charging station is shipped with its power supply and charger regulator boards installed, and with their distribution jacks routed and configured, as illustrated here:

SL PTG012, Rear View

At the front of the unit:

1.Lift open the front door of the enclosure.

2.Locate the pre-drilled hole-pairs, and identify the pairs that will be used to mount the individual battery chargers (refer to the photo at the top of this page).

Door

Charger

Power

Supply

Jacks

Charger Mounting Hole-pairs

SL PTG012 Installation Instructions

Page 2

Image 2
Contents Inventory AMERI*CAN Telecom INCSL PTG012 Tools RequiredSL PTG012, Rear View Technical Document Charger InstallationDoor Charger Power Supply Jacks Charger Mounting Hole-pairs Technical Document BatteryEnclosure Installation PTQ365AMERI*CAN Telecom INC AMERI*CAN Telecom INC