Linear HCI+2 installation instructions Nuts and BOLTS, They will be, Used Again Later

Page 1

HCI+2

1.

PRODUCT DESCRIPTION

2.

KIT CONTENTS

3. LOOSEN AND DISASSEMBLE TURNBUCKLE

The Model HCI+2 2-foot “I-rail” extension is designed to be compatible with

 

 

 

HOLD SCREWDRIVER IN

 

the Model HCI-12 12-foot chain-drive “I-rail” used in commercial garage door

 

 

 

TURNBUCKLE SLOT

 

installations and in carriage house garage door installations.The 2-foot extension,

 

BOTTOM RAIL SECTION

 

LOOSEN THE TWO

 

when added to the 12-foot “I-rail”, provides a 14-foot long rail for operating high-lift

 

 

 

 

 

 

2-Foot Rail Extension

doors.

 

 

 

TURNBUCKLE LOCKING NUTS

 

 

 

 

For Use with HCI-12 12-foot I-beam” Rail

The kit includes two “T-rail” sections that bolt together to form an “I-rail” and

 

REINFORCING STRAPS (2)

 

 

connect to the main “I-rail” using two reinforcing straps. The kit also includes two

 

 

 

 

 

 

 

 

 

short lengths of chain to extend the stock chain at the turnbuckle.

 

 

 

UNSCREW AND

Installation Instructions

 

 

 

 

 

 

 

 

 

 

REMOVE EACH

 

 

 

 

 

 

END FROM THE

 

 

 

 

 

 

TURNBUCKLE

 

 

 

 

TOP RAIL SECTION

 

 

 

 

 

 

1/4-20 KEPS NUTS (5)

NOTE: ONE SIDE OF THE

 

 

 

 

 

TURNBUCKLE IS LEFT-HAND

 

 

 

 

 

1/4-20 x 13/16" CARRIAGE BOLTS (5)

 

 

 

 

 

THREAD, THE OTHER SIDE

 

 

 

 

 

 

IS RIGHT-HAND THREAD

 

USA & Canada (800) 421-1587 & (800) 392-0123

 

 

 

EXTENSION CHAINS (2)

 

 

(760) 438-7000 - Toll Free FAX (800) 468-1340

 

 

 

 

 

 

 

 

 

 

 

www.linearcorp.com

 

 

 

 

 

 

4. REMOVE SPROCKET

5.

REMOVE RAIL BOLT

6.

IDENTIFY TOP AND BOTTOM EXTENSION RAILS

7. ALIGN REINFORCING STRAPS

 

AFTER THE CHAIN IS LOOSENED,

 

LOOSEN THE NUTS AND

 

 

 

LINE UP SLOTS ON THE

 

 

 

 

REINFORCING STRAPS

REMOVE THE SPROCKET HOLDER

 

REMOVE THE TWO END

 

TOP RAIL SECTION

 

 

 

REINFORCING STRAP #1

WITH THE SLOTS ON THE

FROM THE END OF THE RAIL

 

BOLTS ON THE RAIL

 

 

 

 

 

STOCK I-RAIL

 

 

 

 

 

 

 

NOTE: BE SURE AND KEEP THE

 

 

 

 

NUTS AND BOLTS, THEY WILL BE

BOTTOM RAIL SECTION

 

 

 

USED AGAIN LATER

 

 

 

REINFORCING STRAP #2

 

 

 

NOTE: BOTTOM RAIL HAS NOTCH ON CORNER!

 

 

 

 

8. INSTALL FIRST TWO STRAP BOLTS

9. PLACE BOTTOM EXTENSION RAIL BETWEEN STRAPS

10. ALIGN TOP EXTENSION RAIL BETWEEN STRAPS

11. INSTALL REMAINING TWO STRAP BOLTS

INSTALL STRAPS ON BOTH

 

 

 

 

 

SIDES OF I-RAIL

 

FIT BOTTOM RAIL SECTION

 

 

INSTALL THE LAST TWO BOLTS

INSTALL BOLT AND

BOTTOM RAIL SECTION

TOP RAIL SECTION

 

 

AND NUTS THROUGH THE

BETWEEN THE TWO

 

NUT IN FIRST SLOT

 

 

 

REINFORCING STRAP SLOTS

 

REINFORCING STRAPS

 

RAIL EDGES

 

 

 

 

 

 

 

 

MUST LINE UP

 

 

 

 

 

STOCK

 

 

 

 

 

I-RAIL

 

USE 1/4-20 x 13/16" BOLTS

 

STOCK I-RAIL

 

 

 

 

 

 

 

 

AND KEPS NUTS SUPPLIED

BE SURE ALL THE

 

 

 

 

 

SLOTS ARE ALIGNED

 

 

 

 

INSTALL BOLT AND NUT

 

 

FIT THE TOP RAIL SECTION

 

 

RAIL EDGES MUST LINE UP

BETWEEN THE STRAP ON

 

 

IN THE SECOND SLOT

BE SURE ALL THE

 

THIS SIDE AND THE BOTTOM

 

 

FOR SMOOTH TROLLEY

SLOTS ARE ALIGNED

 

 

RAIL SECTION

 

 

OPERATION

 

 

USE 1/4-20 x 13/16" BOLTS

 

 

 

 

 

 

NOTCH ON THE BOTTOM RAIL

 

 

AND KEPS NUTS SUPPLIED

 

 

 

 

 

 

 

WILL BE ON THIS END, BUTTING

 

 

 

 

 

UP TO THE NOTCH ON THE STOCK I-RAIL

 

 

 

Image 1
Contents Nuts and BOLTS, They will be Install Straps on Both Sides of I-RAILUsed Again Later Keps Nuts SuppliedAlign Flat on Sprocket Adjust the Chain Hold Screwdriver Rail AssemblyBe Sure to Tighten ALL Bolts on the Extension