Jumpking JTR6 manual Mat bed

Page 6

Step 5:

Lay the jumping mat (bed) (part no. JTR6B) inside the frame. Springs are used to support the mat (bed) and are connected between “V” rings on the mat (bed) and holes in the top frame rail. There are 48 “V” rings on the mat (bed) that have to line up with corresponding holes on the top frame rail. These are not numbered. To make sure they eventually all line up, pick an arbitrary point and call it zero or 12 o’clock. Connect a spring between the “V” ring and the frame hole at this point (See Fig. 5).

Step 6:

12 o'clock

Top rail

Mat (bed)

FIGURE 5

12 o'clock

Now count 12 holes and “V” rings in a clockwise direction. Attach a spring. You should be at hole 12 or 3 o’clock. Count another 12 holes and “V” rings in a clockwise direction. Attach a spring. You should be at hole 24 or 6 o’clock. Count another 12 holes and “V” rings clockwise and attach a spring. You should be at hole 36 or 9 o’clock. At this point, you should have 4 springs installed at 12, 3, 6, and 9

0

9 o'clock

Clockwise

o’clock (See Fig. 6). This equal tension procedure is essential to properly attach the mat (bed) to the frame.

36 Mat (bed) 12

3 o'clock

Hole numbers: 24

6 o'clock

FIGURE 6

Page 6

Image 6
Contents Product Model JTR6 Jumpking, Inc Limited Trampoline Warranty Assembly Instructions Before YOU BeginAssembly Steps StepHole Top rail Mat bed Assembly is NOW Complete Care and Maintenance Trampoline Safety Safety PrecautionsRules Basic Jumping Technique Fundamental BounceDrawing Ordering Replacement Parts Order Form OrderingPage Jumpking, Inc 901 W. Miller Road Garland, Texas