Life Fitness 663 manual Head Plate Cable

Page 14

STEP 17

Screw one of the threaded ends of the previously removed HEAD PLATE CABLE approximately 1” into the end of the WEIGHT STACK SHAFT. See FIGURE17.

STEP 18

Route the thread end of HEAD PLATE CABLE up and over the PULLEYS in the TOP BOOM above the WEIGHT STACK. (Remove pulleys for ease of installation.)

Screw the other threaded end of the HEAD PLATE CABLE approximately 1” into the end of the shaft on the D-RING. See FIGURE 18.

FIGURE 17

 

HEAD PLATE

 

CABLE

 

(7041801)

WEIGHT STACK

 

 

SHAFT

SECURELY tighten the pulleys connection from the previous step.

Adjust out any slack in the two cable systems. (Refer to your 660101 instructions for the proper procedures.)

FIGURE 18

HEAD PLATE CABLE

(67250)

D-RING

14

Image 14
Contents 663 660 Second Stack Option Important Safety Information Important Notes Parts List Head Elastic X 1 X 1/2 Spacer HEX NUT 67249 PRESS-STACK Loosen Base Cable runs over the top of the bolts in the TOP Boom Head Plate Cable Rear Shroud Front Shroud Head CAP Screw Maintenance Limited Warranty International Offices