Spalding M415571 manual Required Tools and Materials

Page 2

 

 

 

 

REQUIRED TOOLS AND MATERIALS:

 

 

 

 

 

 

 

• (2 each) 9/16” Wrenches

 

 

 

• (2) Stepladders 8 ft. (2.4 m)

 

and/or Socket Wrenches

 

 

 

 

and Sockets

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• (1) Carpenter’s Level

 

 

 

 

 

 

 

(Deep-Well Sockets

9/16"

 

 

 

 

 

 

are Recommended).

 

 

 

 

5.00

127.00

 

 

 

 

 

 

 

Ø .50

12.70

 

 

 

4.00

101.60

 

 

 

 

 

 

 

 

 

 

Ø .625

15.88

 

1.00

25.40

 

 

 

 

 

 

 

INSTALL NET

 

 

 

 

 

 

 

 

 

 

OUTSIDE VIEW

 

 

 

 

 

1.

 

2.

 

 

 

 

 

 

 

3.

 

ID# M415571

04/05

 

 

2

 

Image 2
Contents Rim 411-557Required Tools and Materials