Spalding M8554411 manual Check system leveling. Pole, Should be level in all directions

Page 18

18.

Check system leveling. Pole (1)

 

should be level in all directions.

After system is leveled, completely tighten all nuts (25).

1

252

19.

Apply height adjust ment label (11).

Adjust system by turning crank until desired height is reached per height indicator (30).

WARNING!

READ AND UNDERSTAND

WARNING & HEIGHT

ADJUSTMENT LABELS

BEFORE USING THIS UNIT.

FAILURE TO FOLLOW

OPERATING INSTRUCTIONS

COULD RESULT IN INJURY

OR DAMAGE TO PROPERTY.

NOTE:

If adjustment is necessary, adjust system by rotating the nuts (25) between anchor plate (2) and pole flange.

 

30

10 feet

12

(3.05 m)

 

 

11

ID# M8554411

09/05

18

Image 18
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Make sure nuts 25 are 2.75 7 cm from top of J-bolts Side View Build drainage hillInsert bushings 38 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly ID# M8554411 09/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Yokes 18 Using TWO people to hold the boardAttach backboard 10 to upper and lower First attach board 10 to upper yokeEnd of the end of the rod 14 as shown Figure a Install net 4 to rim as shown Apply height indicator labels 32 & 31 to height indicators Attach height indicators To lower yoke in areaNing 09/05 ID# M8554411 Check system leveling. Pole Should be level in all directionsLimited Lifetime Warranty