Seiko 7R68 manual Date adjustment at the beginning of the month

Page 9

Date adjustment at the beginning of the month

The watch indicates dates from “1” to “31”. In March and months following 30-day months, you will need to make the following adjustment:

 

CROWN

 

Pull out to the first click.

 

1

Turn counterclockwise until “1”

appears in the calendar frame.

Push back in to the normal posi- tion.

English

9

Image 9
Contents Cal R68 Page Contents Spring Drive Mechanism Power Reserve IndicatorSWEEP-MOVEMENT Second Hand UP to 48 Hours of Continuous OperationEnglish Crown Display and Crown OperationCrown HOW to Wind the WatchTurn counterclockwise to advance TIME/DATE SettingDate adjustment at the beginning of the month TIME/DATE Setting HOW to Wind the WatchPower reserve indicator above 1/4 Specifications