STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) Attach a 124” Cable (#51) to the front opening on the Upper Frame (#21). Attach a Pulley (#74) to the opening. Secure it with one M10 x 2 1/8” Allen Bolt (#87), two Ø 7/8” Bushings (#79), and one M10 Aircraft Nut (#99). Make sure the ball stopper of the Cable is underneath the Upper Frame.
B.) Draw the Cable over the Pulley along the Upper Frame to the opening on the rear of Upper Frame. Attach a Pulley to the opening. Secure it with one M10 x 2 1/8” Allen Bolt (#87), two Ø 7/8” Bushings (#79), and one M10 Aircraft Nut (#99).
C.) Draw the Cable around the Pulley then downward. Install a Pulley in between the two Double Floating Pulley Brackets (#35). Secure the Pulley with one M10 x 1 ¾” Allen Bolt (#86), two Ø ¾” Washers (#82), and one M10 Aircraft Nut (#99). Let the Brackets hanging for now.
D.) Draw the Cable around the Pulley then upward to the open bracket on the top of Weight Glide Post (#22). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt (#88), two Ø ¾” Washers (#82), and one M10 Aircraft Nut (#99).
E.) Draw the Cable around the Pulley then downward to the Sliding Weight Post (#34). Secure the Cable to the Sliding Weight Post with one M10 x 1” Allen Bolt (#85), two Ø ¾” Washers (#82), and one M10 Aircraft Nut (#99).
F.) Connect the Lat Bar (#40) to the Cable with a Chain (#80) using two
15