STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) | Attach the 128” Lower Cable (#32) to the open bracket on the bottom of the Leg |
| Developer (#7). |
B.) | Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#69), two Ø |
| ¾” Washers (#80), and one M10 Aircraft Nut (#82). |
C.) | Draw the Cable underneath the Pulley to the open bracket on the Main Base Frame |
| (#8). Repeat Step B above to install a Pulley. |
D.) | Draw the Cable underneath the Pulley along the top of the Main Base Frame through |
| the hole on the bottom of the Front Vertical Frame to an open bracket. Install |
| another Pulley. |
E.) | Pull the Cable upward to the Crossed Double Floating Pulley Bracket (#17) |
| previously installed in |
F.) | Draw the Cable around the Pulley then downward to the open bracket on the Main |
| Base Frame. Install another Pulley. |
G.) | Pull the Cable around the Pulley then upward to the Double Floating Pulley Bracket |
| (#16) previously installed in |
H.) | Draw the Cable around the Pulley then pull downward. Connect the Cable to a |
| (#50) then connect the |
I.) | Connect the Short Chain to the bracket on the back of the Front Vertical Frame. |
| Secure it with one M10 x 1” Allen Bolt (#70), two Ø ¾” Washers (#80), and one M10 |
| Aircraft Nut (#82). |
J.) | Adjust the tension of the Cable by adjusting the length of the Short Chain. For best |
| performance of the machine, adjust the Chain so the Selector Stem (Top Plate) on |
| the weight stack is ¼” above the first plate. While adjusting the weight stack, push |
| down on the Selector Stem to close up the gap then pin the plates. This will remove |
| the slag in the cable system so the range of motion is smooth and tight. |
14