Impex EVE-540 manual Diagram

Page 9

STEP 4 (See Diagram 4)

A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with an Axle (#17), two M10 x ¾” Allen Bolts (#36), and two ¾” Washers (#42).

B.) Insert a Spring (#16) into the slot at the front of Main Frame. Secure the Spring to the slot with one Spring Spacer (#11) and M6 x ½” Philips Screw (#45). Insert one side of the U-shaped Lock Pin (#12) into the Slot.

C.) Attach the Bar Holder (#26) to the Leg Developer (#5). Secure it with a L-shaped Lock Pin (#21).

D.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two Foam Tubes halfway through the holes on the Leg Developer. Push six Foam Rolls (#24) onto the Tubes form both ends. Plug six Foam Roll End Caps (#25) into the Tubes.

E.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a Spring Clip (#22) to the Sleeve.

F.) Remove the L-shaped Lock Pin and Bar Holder when doing Leg exercises. Insert the other side of the U-shaped Lock Pin into the hole on Leg Developer to hold the Leg Developer when doing sit-up exercise.

DIAGRAM 4

8

Image 9
Contents Everlast Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Page Hardware Pack Assembly Instruction See Diagram Diagram Diagram Diagram Page Parts List Impex INC