STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with an Axle (#17), two M10 x ¾” Allen Bolts (#36), and two ∅ ¾” Washers (#42).
B.) Insert a Spring (#16) into the slot at the front of Main Frame. Secure the Spring to the slot with one Spring Spacer (#11) and M6 x ½” Philips Screw (#45). Insert one side of the
C.) Attach the Bar Holder (#26) to the Leg Developer (#5). Secure it with a
D.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two Foam Tubes halfway through the holes on the Leg Developer. Push six Foam Rolls (#24) onto the Tubes form both ends. Plug six Foam Roll End Caps (#25) into the Tubes.
E.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a Spring Clip (#22) to the Sleeve.
F.) Remove the
DIAGRAM 4
8