Impex SM-6200 manual Smith Machine Assembly Instruction

Page 8

SMITH MACHINE ASSEMBLY INSTRUCTION

Tools Required for Assembling the Machine: Two Adjustable Wrenches and Allen Wrenches.

NOTE: It is strongly recommended that two or more people assemble this machine to avoid possible injury.

STEP 1 (See Diagram 1)

A.) Do not tighten all nuts and bolts until instructed to do so.

B.) Attach one Base Frame (#1) to the Left Vertical Frame (#3). Attach the Cross Brace (#6)

to the back of the Left Vertical Frame. Align the holes and secure the Base Frame, Left Vertical Frame, and the Cross Brace together with two M10 x 2 3/8” Carriage Bolts (#83), Ø ¾” Washers (#89), and M10 Aircraft Nuts (#90). Repeat the same procedure to install the other side.

C.) Attach a Guide Rod (#12) onto the Base Frame (#1). Secure it to the Base Frame with one M10 x 1” Allen Bolt (#77) and Ø ¾” Washer (#89) from the bottom.

D.) Slide one Lower Safety Stop Frame (#17) onto the Guide Rod from the top then slide one

Safety Stop Frame (#16) onto the Guide Rod.

E.) Attach a Front Vertical Frame (#2) onto the Base Frame (#1). Secure it with two M10 x 2 3/8” Carriage Bolts (#83), one 6” x 2 ¾” Bracket (#33), two Ø ¾” Washers (#89), and two M10 Aircraft Nuts (#90).

F.) Attach a Safety Hook (#18) to the Lower Safety Stop Frame (#17). Securely it with one M10 x 1” Allen Bolt (#77), two Ø ¾” Washers (#89), and one M10 Aircraft Nut (#90).

 

Attach the Safety Hook onto the selected slot on the back of the Front Vertical Frame.

G.) Repeat Procedure C through F above to install the other side.

H.) Place the Front Top Beam (#5) onto the two Front Vertical Frames (#2).

I.)

Insert the top of the Guide Rods (#12) into the holes on the Front Top Beam. Secure each

 

Guide Rod to the Front Top Beam with one M10 x 1” Allen Bolt (#77) and Ø ¾” Washer

 

(#89).

J.)

Secure each Front Vertical Frame (#2) to the Front Top Beam (#5) with two M10 x 2 3/8”

Carriage Bolts (#83), one 6” x 2 ¾” Bracket (#33), two Ø ¾” Washers (#89), and two M10 Aircraft Nuts (#90).

K.) Secure the Front Top Beam to the Left Vertical Frame (#3) with four M10 x 4” Carriage Bolts (#85), two Triangle Brackets (#20), four Ø ¾” Washers (#89), and four M10 Aircraft Nuts (#90). Repeat the same procedure to secure the other side.

7

Image 8
Contents Marcy Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Precautions Smith Machine Hardware Pack Page Smith Machine Hardware Pack Smith Machine Hardware Pack Smith Machine Assembly Instruction Diagram See Diagram See Diagram Daigram Diagram Cable Loop Diagram See Diagram 5 & Cable Loop Diagram See Diagram 6 & Cable Loop Diagram See Diagram 7 & Cable Loop Diagram Diagram See Diagram Smith Cage Exploded Diagram Smith Cage Parts List ’tyMULTI-PURPOSE Bench Hardware Pack MULTI-PURPOSE Bench Assembly Instruction Securely tighten all Nuts and Bolts installed Diagram Diagram Page MULTI-PURPOSE Bench Parts List Impex INC Info@impex-fitness.com